feedbackspaces

This is a live example — an earlier week of the same student's journey.

Back to the latest session

Tutorial record · Design Studio 2

Tutorial — massing studies

Sam (example student) · Thu 28 May, 15:00

What we agreed

  • Try a ramp connecting the two blocks, so the scheme reads as one building.

  • Check the ramp against a 1:12 gradient before the next review.

What happened

An early look at the gallery massing: two orthogonal blocks with a stair core, and a gap between them that neither plan resolves. The scheme reads as two separate buildings. The way forward discussed was a connecting move — possibly a ramp — and testing whether one organising idea could hold the pieces together.

Pages from the session

p.1

There is no recording for this tutorial.

This page is private to you and your tutor

The work over time

28 May4 Jun

Threads through the term

  • Develop the ramp as the organising move — a two- to three-storey space with light slipping down alongside it.

    28 May4 Jun· raised 2 times — still open

  • Check the ramp against a 1:12 gradient before the next review.

    28 May4 Jun· resolved